Einki úrslit

The First Move into the H-Building

This week, the first patients moved into the H-building. The kitchen, the rehabilitation rooms, and the bed washing facility have already been moved down. We wish the National Hospital, the staff, and the patients a pleasant start.

Our team, led by Anton and Leifur, has designed a significant part of the technical equipment, piping systems, and electrical systems. Notably, the H-building is the largest building in the Faroe Islands that is 100% heated with green energy – using a sea heat pump system.

Ólavur Frederiksen took the pictures inside the building.